Details: topographic survey by taking longitudinal sections at every 10m interval, cross sections at every 5m interval on either side of center line of road including supply of detailed drawings in appropriate scale & size in soft copy & hard copy complete all respect as per direction of engineer and detailed alignment plans with covering all features in a width upto 10 mtrs. earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301. in all type of soil carriage of materials by mechanical transport including loading, unloading and stacking : lead 5 km earth providing, laying, spreading and compacting of granular sub-base byproviding close graded material (table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and
Sector: RDPR