Description: Construction work of Entrance gate at main road near Merta Bypass Name of Work Construction work of Entrance gate at main road near Merta Bypass
Details: Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level: In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.: Depth upto 1.5 m Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.:Bituminous courses Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.:Granular courses Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). Earth
Sector: RDPR