Details: earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils providing and laying inposition cement concrete including curing,compaction etc.complete in specified grade excluding the cost of centering and shuttering- all work upto plinth level. m15 grade nominal mix 1:2:4 (1cement :2coarse sand: 4 graded stone aggregate 20mm nominal size). providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if req
Sector: Water Resource Department