Details: civil works const of wsp khasra no 921 sahawaexcavation of soil upto 1.5 m depth in foundation, trench, drain, tamping the bottom, pouring water, dressing the sides, removing excavated soil, filling up the empty spaces with soil again after filling the foundation and disposal of the remaining soil upto a distance of 50 m. in hard, clayey, gravelly soil, excavation should be done upto 1.5 m depth in item 1.
Sector: RDPR