Details: work dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (wmm) base course comprising of graded stone aggregate and granular material conforming to mort&h specifications (table 400-ii) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per mort&h specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. providing and laying un-reinforced, plain cement concrete mix with concrete mixer & pavement over a prepared sub base with 43 grade cem
Sector: RDPR