Details: work dismantling of existing structures like culverts, bridges, retainingwalls, cc road and other structure comprising of masonry, cementconcrete, wood work, steel work, including t&p and scaffoldingwherever necessary, sorting the dismantled material, disposal ofunserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by engineer. cement concrete grade m-15 and above and pcc blocks lime concrete, cement concrete grade m-10 (1:5:10) and below earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of engineer for following depths, below natural ground / road top level.n all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. depth upto 1.5 m carriage of materials by
Sector: RDPR