Details: demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. 1: 3: 6 or richer mix. dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size). dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 me
Sector: School