Details: topographic survey by taking longitudinal sections at every 10m interval, cross sections at every 5m interval on either side of center line of road including supply of detailed drawings in appropriate scale & size in soft copy & hard copy complete all respect as per direction of engineer and detailed alignment plans with covering all features in a width:upto 10 mtrs. dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by engineer. bituminous courses earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301. in all type of soil carriage of materials by mechanical transport including loading, unloading and stacking :: earth 05km providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (wmm) base cou
Sector: RDPR