Description: Construction of Power Evacuation system for development of 2450 MW Solar Park at Pugal, Bikaner under Lot-1, Lot-2 and Lot-3 including Survey, Design, Engineering, Supply of all equipments /materials, ETC along with associated Civil works on Turnk
Sector: Renewable Energy