Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level.in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.depth upto 1.5 m carriage of materials by mechanical transport including loading, unloading and stacking ::earth 2 km. providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone ggregate 40 mm nominal size). providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work upto plinth level . (as
Sector: RDPR