Details: dismantling of cement concrete pavements as per mord specification clause 202.dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately dismantling of flexible pavements dismantling of flexible pavementsdismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per mord specification clause 202by mechanical meansbituminous courses building stone metal (grit and ballast etc.)with all lead and lift building stone metal (grit and ballast etc.)with all lead and lift dismantling of structuresdismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including
Sector: Urban Authority