Details: item description dismantling brick tiles covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead. demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. 1: 3: 6 or richer mix. earth work in excavation in foundation trench or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m including tacking out the excavated soil and depositing and refilling of jhiri with watering and remming and disposal surplus excavated soil as directed with in a lead of 50 m. all kind of soil. p.c.c
Sector: School