Details: earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301. in all type of soil carriage of materials by mechanical transport including loading, unloading and stacking lead 5 km earth providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (wmm) base course comprising of graded stone aggregate and granular material conforming to mort&h specifications (table 400-ii) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per mort&h specification clause - 406 in
Sector: RDPR