Details: dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by engineer. granular courses earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301.in all type of soil carriage of materials earth including loading and unloading with a lead of 5 km providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per is : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of
Sector: RDPR