Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b) thick excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (c)hard soil mixed with kankar / boulders, morrum preparation of foundation of structure including removal of all loose stones, silt and final washing. (a) by manual labour drilling holes of 35 mm diameter for anchor rods.i) upto 1.50 m depth labour charges for fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete supply of tor steel anchor bars of required diameter, length and shape at site of work complete. providing and layin
Sector: Water Resource Department