Description: P and F of Interlocking Tiles at Industrial Area Mathania Name of Work P F of interlocking tiles at industrial area Mathania
Details: Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305], In ordinary Soil, Mechanically by power shovel, including mechanical loading and carriage by tipper/dumper (6T capacity) Box cutting/Trenching the Sub Grade to proper , camber and removing inequalities including removing deleterious stuff and depositing on the road side slopes (cutting of earth shall be paid separately in the respective item on the basis of classificat Compaction of original ground with maximum of six passes of 8-10 tonnes power roller including filling depression occurring during rolling [MoRTH Specification : Clause 305.3.4] Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5]., Extra for watering the earth to bring the earth upto required O.M.C excluding rolling Extra for rolling to specifica
Sector: Industry Development