Details: cutting and clearance of jungle, bushes, shrubs, ankra/ipomoea, julieflora typna etc., on canals and bunds in dry/moist/slushy conditions including disposal as per instruction of the engineer incharge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick jungle dag belling (b) over 7.5 cm. to 10 cm. deep benching the base and depositing the excavated material including dressing etc. complete within initial lead upto 50 m. and lift upto 1.5 m. earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor's density with initial lift of 1.5m (excluding charges for compaction and watering) including loadin
Sector: Water Resource Department