Details: earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301 in all type of soil carriage of materials by mechanicaltransport including loading,unloading andstacking :: lead 05 km centring and shuttering with plywood or steel sheet upto two stories or height upto 3.5 metre above plinth level including strutting, propping etc. and removal of form for :foundations, footings, bases of columns, etc. for mass concrete. providing and laying lean cement concrete 1:4:8 in sub- base over aprepared sub-grade with coarse and fine aggregate conforming tois: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradationafter blending to be as per table 600-1, cement content not to beless than 150 kg/ , optimum moisture content to be determinedd
Sector: RDPR