Details: dismantling of existing structures like culverts, bridges, retaining walls, cc road and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by engineer.cement concrete grade m-15 and above and pcc blocks lead 5 km carriage of materials by mechanicaltransport including loading,unloading andstacking :: lead 05 km centring and shuttering with plywood or steel sheet upto two stories or height upto 3.5 metre above plinth level including strutting, propping etc. and removal of form for :foundations, footings, bases of columns, etc. for mass concrete. providing and laying lean cement concrete 1:4:8 in sub- base over aprepared sub-grade with coarse and fine aggregate conforming tois: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not t
Sector: RDPR