Details: providing and inserting with approved fixing compound after drilling holes for grouting as per technical specification including subsequent cutting/ removal and sealing of the holes as necessary of after completion of grouting with: epoxy grout [morth specification: clause: 2803] sealing of cracks by injection process through complete with material and labour as per drawing and technical specification [morth specification: clause:2803] epoxy grout replacement of -ptfe complete as per technical specification including lifting of superstructure span by jacking up from below i.e. by placing the jacks on pier/abutment caps for all span length, supplying, fitting and fixing in position true to line and level -ptfe bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, ptfe surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, m
Sector: Road development