Details: chambal major bridge (at km 112+00) part - a : road worksclearing grass and removal of maximum 150mm thickness & dispose off up to a distance of 100 meter outside the periphery of the area by manual means. clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per morth specification clause 201 by mechanical means. in area of light jungle earth work in excavation, including stacking/disposal of surplus material with all lifts and lead up to 50 meters, exclusive of compensation of earth [morth specification : clause 301 to 305] in ordinary soil mechanically by power shovel, including mechanical loading and carriage up to 50m. construction of embankment with approved material obtained
Sector: Road development