Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. depth upto 1.5 m providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level :1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :foundations, footings, bases of columns, etc. for mass concrete. reinforcement for r.c.c. work at all
Sector: RDPR