Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in soft/loose soil. (ignp bsr 2023-24 ch-v, item no-1.1) excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in soft/loose soil.(ignp bsr 2023-24 ch-v, item no-1.1)+extra lead over item no 1 of excavated material , beyond initial lead of 50 m & upto 250 m (ignp bsr 2023-24 ch-v, item no-10.1), (complete rate - 92.00+9.50 = 101.50) excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in soft/loose soil.(ignp bsr 2023-24 ch-v, item no-1.1)+ extra lead over item no 1 of excav
Sector: Irrigation