Details: surveying road alignments to prepare plan, l- section, x- sections and to compute earthwork quantities including compass survey at required points, levelling at 25 m inerval for l- sections and 50 m interval for x-sections up to desired width, preparing and submission of plan, l-section ( not more than 500 m length in one sheet ) and x-section in a-4 size showing various details like geometrical datas, habitations, electric lines, water courses and other sprcial features, computation of earth work after marking desired grade line, marking sufficient bench marks in field to check the survey etc.complete as per direction of enginner - in charge. clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm th
Sector: Urban Authority