Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. depth upto 1.5 m (outer side) wall providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all work upto plinth level : 1:4:8 (1 cement : 4 fine / coarse sand : 8 graded stone aggregate 40mm nominal size) random rubble masonry with hard stone in foundation and plinth : cement mortar 1:4 (1 cement : 4 coarse sand) extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. providing and laying damp-proof course 50mm thick
Sector: RDPR