Details: part "a" cc work earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305).in ordinary soilmechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper special repair of road from a/r ewad( cc portion ewad) km 0.60 vr special repair of cc road from jayal-jhalalad (cc in village portion jayal & jhalald) km 0.50 vr providing and laying granular sub-base material (from natural quarry) having p.i.not more than 6, including spreading in layers not exceeding 150 mm compacted thickness and consolidation by 8-10 tonne power roller to required camber and grade including cost of water and hire charges of machinery, including t&p and all lead of material from quarry (compacted thickness to be measured).as per morth specifaction table 400-1,400-2:iii) grading lll special repair of road from a/r ewad( cc portion ewad) km 0.60 vr spe
Sector: PWD