Description: Construction and maintenance of cross drain and speed breaker at different place of Ward no 21 to 45 Name of Work Construction and maintenance of cross drain and speed breaker at different place of Ward no 21 to 45
Details: Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m Carriage of Materials by mechanical transport including loading, unloading and stacking : Earth Iead up to 5 KM Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) Half brick masonry with FPS brick of class designation 75 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:
Sector: RDPR