Details: dagbelling 5 to 7.5 cm deep clearance of jungle and cutting of ordinary vegetation shrubs and bushes excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respecthard soil mixed with kankar / boulders, morrum excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respectsoft / disintegrated rock excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respecthard rock without blasting cement concrete 1:3:6 well mixed and laid in position complete including all leads of all
Sector: Irrigation