Details: dagbelling 5 to 7.5 cm deep clearance of jungle and cutting of ordinary vegetation shrubs and bushes excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect hard soil mixed with kankar / boulders, morrum soft / disintegrated rock hard rock without blasting cement concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of 20mm size cement mortar for apron 1;6, 23cm kharanja for thickness random rubble stone masonary in cement mortar 1:6 forfoundation and super structure cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm hb. cement plaster in cement sand mortar 1:4, 25mm thick with curing. excavation including load
Sector: Irrigation