Details: 3.7 construction of check dams by loose stoneincluding digging and breaking of stones (rates are for volume including voids)3.7.1 lead upto 200 m 3.7 construction of check dams by loose stoneincluding digging and breaking of stones (rates are for volume including voids)3.7.2 lead above 200 m survey and dagbelling work earth work for bund/embankment in dry of moist soil with the help of tractor attached with scraper including laying in layers of 15 cm breaking of colds sorting of grasses pebbles etc and dressing in required profile when compacted manually within initial lead of 30 m and lift of 1.50 m rate of tractor (30-45 hp) with pol & scraper (excluding charges of watering charges of watering & compaction) rehandling and filling with excavated earth in 20cm. layers including watering, ramming, leveling and dressing etc. complete with lead up to 50m. and lift up to 1.5m. earth work for bund/embankment in dry of moist soil with the help of tractor attached wi
Sector: Forest and Environment