Details: as per bsr description earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before cmpaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor's density with initial lift of 1.5m (excluding charges for compaction and watering) including loading and un-loading wherever requiredcomplete in all respect. watering of earth including cost of carrige of water when source of water upto 5 km compaction of earth by manually or plain roller ( density 90 % of proctor) excavation in dry or moist and disposal of excavated material within initial lead of 30m and lift of 1.5m including dressing etc. complete. cement concrete well mixed with cement mortar (1:4:8) laid in position complete excluding curing with ag
Sector: Irrigation