Details: survey of area, demarcation and lay outdesign & layout dividing the area in sub-plots and their semi permanent demarcation in field and preparation of maplay out of excavation of pits digging of pits of size [0.50+0.40]/2x0.45m hard soil having more than 50% boulders(outer fencing) fencing stone wall fencing: random rubble loose stone fencing of size 0.8 m at base, 0.60 m at top and 1.20 m high (rates are for volume including voids) 2.2.1.1 if lead is less than 200 m (2071 rmt) (inner fencing) 3 stand barbed wire fencing with 1.5 m high, 50x50x6 at 5 m distance (2062 rmt)purchase of tall plant 3 feet
Sector: Forest and Environment