Details: part-a (building work) based on bsr pwd - 2022, jaipursurface dressing of the ground including removing vegetation and ineqalities not exceeding 15 cm deep and disposal of lead up to 50 mtr. and lift up to 1.5 mtr. all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils supply & stacking good earth at site complete including loading , unloading and transportation etc &filling available excavated earth (excluding rock) in trenches plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead upto 50 mtr. and li
Sector: School