Details: part - a : civil work clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per morth specification clause 201 by mechanical means . a. in area of light jungle earth work in excavation, including stacking/disposal of surplus material with all lifts and lead up to 50 meters, exclusive of compensation of earth [morth specification : clause 301 to 305] mechanically by power shovel, including mechanical loading andcarriage up to 50m. construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting by vibrat
Sector: PWD