Details: detailed survey of site with total station including plane table survey of built up areas showing road level, boundary walls, electric poles adjecent building / plot deatails, set back, other existing structures (temperoriy or permanent) sewer lines and septic tanks main plumbing lines, nalas or drains water bodies / water logging areas as may be required depending upon the site conditions / topography of the area including print out on required size paper in three copies and one soft copy as per direction of engineer in charge.for built up area less than 10%
Sector: Urban Authority