Details: ditch fencing: size-1.50m. at top ,0.90m. at base and 1.20m. high(rates are for volume including voids) .laying of dug up soil on inner side of the plantation and removing boulders from it. mechanically 552 rmt excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect hard / dense soil 500 rmt x 1.44 = 720 excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect soft/loose soil 1200 rmt x 1.44 = 1728
Sector: Forest and Environment