Details: 1 surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of lead up to 50 mtr. and lift up to 1.5 mtr.: all kinds of soilearth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus xcavated soil as directed with in a lead of 50 meter.3 providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
Sector: Forest and Environment