Details: product category civil works advance action work at khila 2rdf-ii range devla, udaipur state plan 2024-25. 4105 advance soil work survey and layout (including line clearance)stone wall facing:- construction of wall using dry masonry of stone 1.20 m. high, 0.80 m. at ground level and 0.60 m. wide from top with alignment and markingstone wall repairs to be done by digging out stones available at a distance of less than 200 mplacing 3 cm or more thick layer of soil on the surface of stone wallmaking subdivisions of 2 or 2.5 hectare size in the area and demarcating them by burying stones and writing with paintdogbelling work for digging contour trench/staggered trench/deep cctinside the stone wall of plantation area; for spm mkham midbpadh) 0.30 m from the wall. dig a trench of 0.30 x 0.30 m cross section and make a mound towards the wall by separating pebbles and stones from the excavated soil.hard clay soil upto 20% boulders total 1000 rmihard clay soil more than 20% bou
Sector: Forest and Environment