Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. taking out doors, windows and clearstory windows shutters (steel or wood) including stacking within 50 meters lead: of area 3 square meter and below. providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 kg/sqm) on top of hot bitumen @ 1.7 kg/sqm. (1.40 kg of vg-40 (30/40 )grade and 0.30 kg/sqm. of vg-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of engineer-in-charge. brick work with f.p.s. bricks of class designation 75 in superstructure above plinth level upto floor v level in all shapes and sizes in : cement mortar 1 : 6 (1 cement : 6 coarse sand) 150cm high fencing with angle iron 50x50x6mm. placed at every 3mtr. apart 30cm. in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner and e
Sector: PWD