Details: dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead: of area 3 square meter and below. dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead: for thickness of tiles 10mm to 25mm. dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead. dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. dismantling gi pipes (external work) including excavation and refilling trenches after taking out the pipes and including stacking of pipes within 50 meter lead: 15mm to 40mm nominal bore. plaster on new surface on walls in cement sand mortar 1:4 including racking of
Sector: PWD