Details: construction of 33/11kv gss levelling of ground levelling of ground up to 30 cm.depth. with tractor and t&p required as per condition of ground including removal of plants from ground & marking of boundary with lime powder.(including all lead & lifting) levelling of ground above 30 cm.to 90 cm.depth. with tractor and t&p required as per condition of ground including removal of plants from ground & marking of boundary with lime powder.(including all lead & lifting) trimming of tree branches/plants and preparing route approchases for proposed line. excavation of pit in ordinary rock which does not require blasting to various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. 9 mtr/ 1.2mx0.6mx1.50 m deep (c)stay set/depth of pit 8'x 3/4" -0.75x0.5x1.6 m 6'x 5/8" -0.75x0.5x1.35 m excavation of pit in hard rock ( where blasting is required) to various supports and stay sets including stacking of excavated muck from the edge of exc
Sector: Distribution