Details: earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed within a lead of 50 meter. all kinds of soil. centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways and removal of formwork for foundations in basements rafts, footings, strap beams, bases of columns , etc. up to plinth level. providing and laying in position specified grade of reinforcement cement concrete all rcc structural elements upto plinth level including curing compaction finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering shuttering and reinforcement level. m20 grade nominal mix (with graded stone aggregate 20mm nominal size) providing and fabricating reinforcement
Sector: Urban Authority