Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( c)hard soil mixed with kankar / boulders, morrum final excavation by line drilling including removing of hard rock by wedging and barring and chiseling near final levels (only upto 0.3 m depth) without resorting to blasting including dewatering, disposal of excavated material within initial lead of 50m and lift of 1.5m complete in all respect preparation of foundation of structure including removal of all loose stones, silt and final washing. by mannual labour. drilling holes of 35 mm diameter for anchor rods. i) up to 1.50 m. depth labour charges for fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete supply of tor steel anchor bars of required diameter, length and shape at site of work complete. providing and
Sector: Water Resource Department