Details: items cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, julieflora typna etc. on canals and bunds in dry/mosit/ slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. (a) ordinary excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (c)hard soil mixed with kanker /morrum /boulderas earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor's d
Sector: Water Resource Department