Details: items cutting & clearance of jungle, bushes, shrubs ankra/i pomoea, julieflora typna etc. on canals and bunds in dry/moist/ slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. ordinary excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) hard dense soil providing, laying and fixing in position rcc spun or hume pipe with collars (isi 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 600mm np4 (b)quarry rubish not more than 10 cm in size including all lead and lift. spreading of quarry / spalls / murranda to required grade & camber in layers not exceeding 15 cm.
Sector: Water Resource Department