Details: part - a : civil work surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of lead up to 50 mtr. and lift up to 1.5 mtr. : all kinds of soil earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils diluting and injection chloropyrifos emulsifiable concentrate 20% with 1% concentration for pre-constructional anti termite treatment as per is 6313 part iii as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor
Sector: PWD