Details: earth work in excavation for roadway, includingtrimming bottom and side slopes in accordancewith requirement of line, grades and cross sections,including disposal of surplus material with all liftand lead upto 1000 metre as per mort&hspecification clause 301. in all type of soil300.000 214.50 64350.00 64350.00 inr sixty four thousand three hundred & fifty only2 providing and laying lean cement concrete 1:4:8 insub- base over a prepared sub-grade with coarseand fine aggregate conforming to is: 383, the sizeof coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1,aggregate gradation after blending to be as pertable 600-1, cement content not to bess than 150kg/ , optimum moisture content to bedetermined during trial length construction,concrete strength not to be less than 10 mpa at 7days, mixed in concrete mixer, laid manually,compacted with surface , finishing andcuring complete as per clause 601, 112 ofmort&h specification including all material,labour, mac
Sector: General Admin