Details: item code [2022 3.16 embankment]:item type [road] :: embankment construction with material obtained from borrow pits (construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2) item code [2022 3.18]:item type [road] :: construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) item code [2022 3.7]:item type [road] :: excavation in ordinary rock using hydraulic excavatorck-90 and tippers with disposal upto 1000 metres. (excavation for roadway in ordinary rock with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000m, trimm
Sector: Urban Authority