Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level depth upto 1.5 m providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work upto plinth level . (as per design mix)1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth leve
Sector: RDPR