Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. hard/dense soil providing and laying in position of cement concrete nominal mix (1:3:6) including leads of all construction materials, curing, compaction, and finishing with rendering in cement sand morter 1:3 (1 cement: 3 coarse sand) -and making good the joints excluding the cost of centering, shuttering and reinforcement. well graded crusher broken stone aggregate of maximum size upto(d) 20 mm random rubble stone masonary (using r.r. stone where 75% stones to be not less then 15cm in size in any direction and weighting not less then 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.. in cement sand mortar 1:6 random rubble stone masonary (using r.r. stone where 75% stones to be not less
Sector: Water Resource Department